The Williamsburg Civic Association
Arlington, Virginia 22207
WCA Sign Logo

About Williamsburg Civic Association

Funding Sources
  Neighborhood Conservation (NC)
    NC Process
    WCA NC Projects
    NC Projects Schedule
    NCAC Point System
    NCAC Point System Work Sheet
    NCAC Project Ranking (Spring 2001)
    NCAC Spring 2001 Funding Meeting
  Neighborhood Traffic Calming Program
  Safe Routes to School
  Small Parks Grants
  Program Guidelines
  FY2003 Invitation
  Tree Initiative
    2003 Funding
    Public Tree Planting Guidelines
    Commemorative Tree Program
    Notable Tree Program
    Arlington Beautification Committee
Conservation Plan
Little Falls Project
Minor Hill
Williamsburg Boulevard NC Project
Sycamore NC Project
Neighborhood Signs
Zoning & Infill
Traffic Calming
Neighborhood Issues
Site Map

NCAC Meeting
June 14, 2001

Won Some/Lost Some

The good news is that both the Little Falls and Minor Hill project were approved. The bad news is that both projects were cut back significantly.

The Neighborhood Conservation Advisory Committee met on 14 June to discuss and vote on the 41 projects which were submitted by participating neighborhoods for funding under the second round of the 2000 Neighborhood Conservation Bond. These 41 projects represented a total cost of $7.7 million. NCAC had about $2 million to spend. Williamsburg submitted two projects:

  • Little Falls Project ($332,000) with 70 NC points (click here for a discussion of the NCAC points system), tying with two other "new" neighborhoods for the highest number of points.
  • Minor Hill ($170,000) with 50 NCAC points and 5th highest project.

Ellen Jones presented the WCA projects. Ann Rudd, our NCAC representative also attended the meeting.

After the project presentations, a lively discussion ensued on which ones to fund.

  • WCA and the other "new" neighborhoods (with the top-ranked projects) favored funding by going straight down the points list.
  • Some of the "older" neighborhoods (whose projects were lower ranked because they had already used up their Big Four first projects) favored funding only neighborhood priority one projects.
  • A third option was to scale back the "new" neighborhood projects on top of the points list so that an additional four projects could be funded.

NC members voted in favor of a revised Option Three.

  • Williamsburg was asked to scale back our Little Falls project by deferring the North Nottingham to North Lexington Street portion.
  • Williamsburg was also asked to defer the Minor Hill project altogether, but – thanks to a happy intervention on the part of a kindred spirit from a neighboring civic association – we succeeded in salvaging the use/development plan portion of it.


County Board Approval
: The Arlington County Board approved these two scaled-back projects on 8 September, 2001, as part of a $2.1 million package of sixteen projects. This was the largest NCAC funding round in the history of the program, which is still seriously under-funded. More Information